首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   15篇
  免费   4篇
  2019年   1篇
  2017年   1篇
  2016年   1篇
  2015年   1篇
  2014年   3篇
  2011年   1篇
  2009年   1篇
  2008年   5篇
  2006年   1篇
  2005年   1篇
  2004年   1篇
  2001年   1篇
  1993年   1篇
排序方式: 共有19条查询结果,搜索用时 15 毫秒
1.
In scheduling problems with two competing agents, each one of the agents has his own set of jobs to be processed and his own objective function, and both share a common processor. In the single‐machine problem studied in this article, the goal is to find a joint schedule that minimizes the total deviation of the job completion times of the first agent from a common due‐date, subject to an upper bound on the maximum deviation of job completion times of the second agent. The problem is shown to be NP‐hard even for a nonrestrictive due‐date, and a pseudopolynomial dynamic program is introduced and tested numerically. For the case of a restrictive due‐date (a sufficiently small due‐date that may restrict the number of early jobs), a faster pseudopolynomial dynamic program is presented. We also study the multiagent case, which is proved to be strongly NP‐hard. A simple heuristic for this case is introduced, which is tested numerically against a lower bound, obtained by extending the dynamic programming algorithm. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 1–16, 2014  相似文献   
2.
We consider a make‐to‐order manufacturer facing random demand from two classes of customers. We develop an integrated model for reserving capacity in anticipation of future order arrivals from high priority customers and setting due dates for incoming orders. Our research exhibits two distinct features: (1) we explicitly model the manufacturer's uncertainty about the customers' due date preferences for future orders; and (2) we utilize a service level measure for reserving capacity rather than estimating short and long term implications of due date quoting with a penalty cost function. We identify an interesting effect (“t‐pooling”) that arises when the (partial) knowledge of customer due date preferences is utilized in making capacity reservation and order allocation decisions. We characterize the relationship between the customer due date preferences and the required reservation quantities and show that not considering the t‐pooling effect (as done in traditional capacity and inventory rationing literature) leads to excessive capacity reservations. Numerical analyses are conducted to investigate the behavior and performance of our capacity reservation and due date quoting approach in a dynamic setting with multiple planning horizons and roll‐overs. One interesting and seemingly counterintuitive finding of our analyses is that under certain conditions reserving capacity for high priority customers not only improves high priority fulfillment, but also increases the overall system fill rate. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   
3.
法治的实现有赖于法治要素的具备,而正当程序有助于法治要素的满足。法治社会应具有的正当程序理念是:正当程序是对人权的尊重和保护,是实现正义的重要途径,程序正义优先于实体正义。  相似文献   
4.
We consider scheduling problems involving two agents (agents A and B), each having a set of jobs that compete for the use of a common machine to process their respective jobs. The due dates of the A‐jobs are decision variables, which are determined by using the common (CON) or slack (SLK) due date assignment methods. Each agent wants to minimize a certain performance criterion depending on the completion times of its jobs only. Under each due date assignment method, the criterion of agent A is always the same, namely an integrated criterion consisting of the due date assignment cost and the weighted number of tardy jobs. Several different criteria are considered for agent B, including the maxima of regular functions (associated with each job), the total (weighted) completion time, and the weighted number of tardy jobs. The overall objective is to minimize the performance criterion of agent A, while keeping the objective value of agent B no greater than a given limit. We analyze the computational complexity, and devise polynomial or pseudo‐polynomial dynamic programming algorithms for the considered problems. We also convert, if viable, any of the devised pseudopolynomial dynamic programming algorithms into a fully polynomial‐time approximation scheme. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 416–429, 2016  相似文献   
5.
It is known that the proportionate flow shop minimum makespan F m / p r p t / C max problem is solved optimally by any permutation job sequence. We show that the F m / p r p t / C max problem is at least ordinary NP‐hard when missing operations are allowed and present some solvable cases. We then consider the standard proportionate flow shop problem (with no missing operations) and show that the solution algorithms for a class of single‐machine due date assignment problems can be extended/generalized to the corresponding proportionate flow shop problems. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 98–106, 2015  相似文献   
6.
We consider a class of production scheduling models with m identical machines in parallel and k different product types. It takes a time pi to produce one unit of product type i on any one of the machines. There is a demand stream for product type i consisting of ni units with each unit having a given due date. Before a machine starts with the production of a batch of products of type i a setup cost c is incurred. We consider several different objective functions. Each one of the objective functions has three components, namely a total setup cost, a total earliness cost, and a total tardiness cost. In our class of problems we find a relatively large number of problems that can be solved either in polynomial time or in pseudo‐polynomial time. The polynomiality or pseudo‐polynomiality is achieved under certain special conditions that may be of practical interest; for example, a regularity pattern in the string of due dates combined with earliness and tardiness costs that are similar for different types of products. The class of models we consider includes as special cases discrete counterparts of a number of inventory models that have been considered in the literature before, e.g., Wagner and Whitin (Manage Sci 5 (1958), 89–96) and Zangwill (Oper Res 14 (1966), 486–507; Manage Sci 15 (1969), 506–527). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   
7.
调价公式作为FIDIC合同中最重要的风险分配方式之一,通过对可调价要素价格指数或价格的调整,把合同中的隐性风险在业主和承包商之间的分配比例作了明确规定.从承包商的角度,并基于业主的原因造成工期延长的条件下,对调价公式中各个组成因子及其权重对调价结果的影响进行了研究,探索把调价公式同成本管理有机结合起来,以期达到降低成本...  相似文献   
8.
We consider the problem of maximizing the number of on‐time jobs on two uniform parallel machines. We show that a straightforward extension of an algorithm developed for the simpler two identical parallel machines problem yields a heuristic with a worst‐case ratio bound of at least . We then show that the infusion of a “look ahead” feature into the aforementioned algorithm results in a heuristic with the tight worst‐case ratio bound of , which, to our knowledge, is the tightest worst‐case ratio bound available for the problem. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   
9.
用功能强大的ADUC831芯片代替原控制盒的87C51芯片,为引入各种先进算法,改进坦克炮控系统的控制品质,打下了软硬件基础。新系统用C语言编程,简化硬件设计,实现与上位机通信,便于数据采集、在线参数调试和性能分析。  相似文献   
10.
We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a make‐to‐order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two‐machine flow shop, consider several variations of this problem, and design effective due‐date quotation and scheduling algorithms for centralized and decentralized versions of the model. We perform extensive computational testing to assess the effectiveness of our algorithms and to compare the centralized and decentralized models to quantify the value of centralized control in a make‐to‐order supply chain. Since complete information exchange and centralized control is not always practical or cost‐effective, we explore the value of partial information exchange for this system. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号